Vulcan 1ER50A User Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
ERA & EBD SERIES ELECTRIC FRYERS - REMOVAL AND REPLACEMENT OF PARTS
FILL SOLENOID VALVE
(KLEENSCREEN FRYERS ONLY)
1. Disconnect swivel pipe fitting at rear of fry tank.
2. Disconnect fill solenoid valve lead wire
connector from below control panel.
3. Remove screws (2) securing the solenoid valve
body flange to pipe tee then remove the
assembly from fryer.
A. Remove pipe fittings from solenoid valve
and install on replacement valve.
4. Reverse procedure to install and check for
proper operation.
HEATING ELEMENTS
Do not sharply bend and kink, or clamp
down on the capillary tube or damage may occur.
1. Raise heating elements.
A.
If replacing left heating element, loosen
high limit bulb and capillary tube clamps.
Remove high limit bulb and capillary tube
from clamps then position away from
element.
B. If replacing right
heating element, remove
temperature probe clamps and position
temperature probe away from element.
NOTE: When installing high limit, route the capillary
tube and center the bulb between the clamps before
tightening.
2. Remove element assembly clamps.
3. Remove element head cover as outlined under
COVERS AND PANELS.
4. Disconnect heating element lead wires.
NOTE: Each heating element assembly contains
three individual elements (six lead wire connections
total).
5. Remove screws from heating element mounting
bracket and remove heating element.
F25385 (May 2010)Page 9 of 32
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 31 32

Comments to this Manuals

No comments