Vulcan 24RRG User Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
Fig. 15
7. Remove the three NPT elbows. Two on front and
one on the back of dual solenoid valve.
NOTE: Be sure to note positioning of NPT elbows on
dual solenoid valve.
8. Reverse proceedure for installation.
NOTE: When installing solenoid valves be sure that
the coil valve clamp is placed correctly and that the
valve clamp hold down nut is securely tightened.
Clean pipe threads and apply thread
sealant that is suitable for use with propane gases.
9. Check for proper operation.
SINGLE SOLENOID VALVE
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
Shut off the gas before servicing the
unit.
All gas joints disturbed during
servicing must be checked for leaks. Check with a
soap and water solution (bubbles). Do not use an open
flame.
1. Remove
CONTROL PANEL.
NOTE: Plumbing and type of Single Solenoid Valve
may vary slightly between different units.
2. Label and disconnect connectors on single
solenoid valve.
3. Remove retaining screws that are holding single
solenoid valve body in bracket.
4. Disconnect compression fitting and remove flex
tubing from front of single solenoid valve.
Fig. 16
5. Lift solenoid out of bracket and arrange it to
access compression fitting in back of single
solenoid valve.
6. Disconnect compression fitting in back of single
solenoid valve.
7. Remove street elbow and NPT elbow from single
solenoid valve.
Fig. 17
NOTE: Be sure to note the positioning of the elbow.
8. Reverse proceedure for installation.
Clean pipe threads and apply thread
sealant that is suitable for use with propane gases.
9. Check for proper operation.
RRG SERIES HEAVY DUTY GAS GRIDDLE - REMOVAL AND REPLACEMENT OF PARTS
F45514 (0214) Page 10 of 24
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 23 24

Comments to this Manuals

No comments