Vulcan 24RRG User Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
Fig. 30
A. To increase pilot flame turn valve needle
counterclockwise. To decrease pilot flame,
turn valve needle clockwise.
6. Once pilot flame is adjusted correctly, turn off
power switch.
7. Connect dual solenoid valve connectors.
8. Install CONTROL PANEL.
9. Check for proper operation.
SOLENOID VALVE TESTS
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
1. Remove CONTROL PANEL.
2. Check for proper gas pressure.
3. Connect power to machine.
4. Turn on power switch and adjust temperature
controls to call for heat.
5. Check for 120VAC between both terminals on
each solenoid.
Fig. 31
Fig. 32
A. On single solenoid valve, if no voltage -
check wiring and on/off power switch.
B. On dual solenoid valve if no voltage - check
wiring, IGNITION MODULE, and
TEMPERATURE CONTROLLER.
6. If 120VAC is present between two terminals after
performing previous steps, either the solenoid
coil or valve is malfunctioning.
7. To determine if solenoid coil is malfunctioning,
check resistance between both terminals on
solenoid. Readings of 100 ohms or less indicate
a shorted coil. Solenoid needs replaced.
RRG SERIES HEAVY DUTY GAS GRIDDLE - SERVICE PROCEDURES AND ADJUSTMENTS
Page 17 of 24 F45514 (0214)
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 23 24

Comments to this Manuals

No comments